Berapa Luas Lahan yang Dibutuhkan Pabrik Pembuatan Pupuk Campuran

When you plan to set up a blended fertilizer manufacturing plant, land area is an aspect must pay attention to. Umumnya, with a standard fertilizer mixing system of 1-100TPH, you need to prepare an area of 500-2000 . It usually contains zone for bulk blending fertilizer making line, materials storage, bagged fertilizer palletizing. If you need to produce BB fertilizer in a limited area, there are also customized solutions with reasonable design. Such as pit-type layout, bucket lift convey, dll.. Welcome to inquiry YUSHUNXIN for your own blend fertilizer making process.

Get Free Quote

3 Functional land needed by a a blended fertilizer manufacturing plant

To make your bulk blending fertilizer system works efficiently all year, it is necessary to split the land into required functional sections.

Normally, ada 3 main zones in the workshop for a bulk blending fertilizer making plant. Powder and granular raw material storage, fertilizer blending system installation and finished BB fertilizer in stock.

Tetapi, if you plan to extend you fertilizer production business, it is advisable to reserve space for future silos, extra batching bins, or an additional fertilizer mixing unit. Jadi, you can upgrade output without changing the land needed by a blended fertilizer manufacturing plant.

Get a Free Quote

500-2000 ㎡ land for 1-100TPH standard bulk blending fertilizer making factory establish

Dengan konfigurasi standar, the land needed by a blended fertilizer manufacturing plant mainly depends on capacity. Biasanya, for 1-100TPH operations, you need to prepare a workshop land of 500-2000 .

  • 1–10 TPH

    A 1–10 TPH BB fertilizer production line often fits in 500–800 ㎡. Untuk ini, you still arrange separate zones for raw material bins, batching and mixing area, and bagging station.

  • 10–50 TPH

    For 10–50 TPH fertilizer blending systems, you usually prepare 800–1,500 ㎡. Since you need more space for urea, PETA, DAP, KCL, fillers, trace element additives, and finished fertilizer pallets.

  • 50–100 TPH

    When you design a 50–100 TPH continuous BB fertilizer blending project solution, the land needed by a blended fertilizer manufacturing plant generally reaches 1,500-2,000 . Because you must include weighing hoppers, multi-bin batching systems, automatic bagging lines, and truck loading areas in one complete layout.

If you plan your receiving area, internal traffic, and warehouse height properly, you often reduce the total land needed by a blended fertilizer manufacturing plant, and you still keep good material flow and flexible operation.

Atas 2 solutions for limited area fertilizer mixing system design

If your land is tight, YUSHUNXIN also can offer customized high-efficiency BB fertilizer production solutions. It will designed with a compact pit-type layout or vertical conveying.

If you want a tailored design for your own BB fertilizer project, selamat datang untuk menghubungi YUSHUNXIN sekarang! Besides land, we will design blend fertilizer making solutions according to your capacity, anggaran, bahan, dll.. Seperti 30 Rencana produksi pupuk TPH BB, $200,000 cost fertilizer mixing system, npk fertilizer blending lines, compost fertilizer mixing unit and more.

Tinggalkan Pesan Anda

    • *Nama Anda

    • *Email Anda

    • Perusahaan Anda

    • *Bahan Baku Anda

    • Telepon Anda (dengan kode area)

    • *Kapasitas Anda Per Jam

    • *Info lebih lanjut tentang proyek Anda

    KONSULTASI GRATIS

    Memberi Anda Pupuk Khusus
    Memadukan Solusi Proyek Sekarang!

    KONSULTASI GRATIS

    Tinggalkan Pesan Anda

      • *Nama Anda

      • *Email Anda

      • Perusahaan Anda

      • *Bahan Baku Anda

      • Telepon Anda (dengan kode area)

      • *Kapasitas Anda Per Jam

      • *Info lebih lanjut tentang proyek Anda

      swt Penawaran Gratis Penawaran Gratis
      WhatsApp Kami